Skip to content
Apex Concrete and Exteriors

Commercial concrete in Portland, Oregon

Commercial ADA curb ramps and flatwork

Scope curb ramps and associated flatwork against the drawings and accessibility details your project specifies.

Prepare your estimate
Curb ramp with tactile paving and a lowered curb at a neighborhood intersection
Curb ramp with tactile paving

The drawings and accessibility details define the ramp scope.

Commercial curb ramps should not be estimated from a generic ramp photograph. Plan geometry, spot elevations, landing and approach conditions, detectable warnings, related flatwork, and the accessible route all need to be reviewed. Apex coordinates concrete work against the project documents, not a blanket claim of compliance.

Start with these inputs

  • Provide ramp and site-plan sheets with applicable details
  • Identify specifications, detectable-warning requirements, and bid date
  • Document pedestrian routes, tenants, deliveries, and phasing
  • Clarify demolition, drainage, transitions, inspection, and closeout scope

The route to the ramp is part of the work.

Curb ramp with tactile paving and a lowered curb at a neighborhood intersection
Curb ramp with tactile paving

A ramp connects sidewalks, curbs, streets, parking, and entrances. The review needs to show those relationships and any constraints during construction. Where the property must remain active, include the temporary routing and staging requirements in the bid conversation.

The scope conversation

  • Review ramp locations and accessibility details on the plans
  • Coordinate grades, transitions, and detectable-warning scope as drawn
  • Document access, phasing, and related flatwork

Use the project's actual plans and accessibility requirements. A marketing page is not a certification of compliance. 2010 ADA Standards for Accessible Design.

What shapes the estimate

There is no responsible per-square-foot price without the actual scope. These are the inputs that change the work and belong in a written estimate.

  • Ramp geometry, demolition, forming, and related flatwork
  • Specified detectable warnings, transitions, and drainage
  • Accessible routing, pedestrian staging, and occupancy constraints
  • Required inspections, documentation, and project closeout

MasterFormat reference

03 30 00

Cast-in-place concrete

Slabs, stem walls, and footings as drawn.

32 16 00

Curbs, gutters, sidewalks, and driveways

Related site concrete, including ADA curb ramps.

References organize the scope. The actual drawings and specifications determine what is included.

ADA curb ramps across Portland

Central Portland

Active intersections in the Core

Urban ramp work can affect pedestrian routes, curb activity, and adjacent businesses. Document the ramp geometry, crossing movement, and how access will be maintained during the work.

Read the zone guide

Northwest Portland

Ramp grades in Northwest Portland

Where the approach or street grade varies, the drawings need to address those transitions explicitly. Include plan elevations, approach photos, and any retaining or drainage features.

Read the zone guide

Southwest Portland

Sloped approaches in Southwest Portland

For a hillside property or sloped approach, show the complete route to the ramp, not only the curb. Landing space, handrails, and drainage may need to be addressed in the project documents.

Read the zone guide

Northeast Portland

Existing curb conditions in Northeast Portland

Older curb lines, tree roots, and patched sidewalks can affect ramp reconstruction and associated flatwork. Show each transition and include the plans that govern the replacement.

Read the zone guide

Southeast Portland

Commercial access routes in Southeast Portland

For a retail, office, or light-industrial property, show the full route between parking, the ramp, and the entrance. Phasing should account for tenants, deliveries, and an accessible temporary route where required.

Read the zone guide

How the estimate is scoped

  1. 01

    Send plan sheets, specifications, and the bid date

  2. 02

    Review the site, pedestrian routes, and project constraints

  3. 03

    Coordinate a written ramp and flatwork scope

What to send with your request

  • Ramp and site-plan drawings
  • Applicable specifications and accessibility details
  • Pedestrian-route and occupancy constraints
  • Bid date and project ZIP code

Useful project details

Include your ZIP code, approximate size, timing, and any access or occupancy constraints. Commercial requests should include plans, specifications, and the bid date.

The estimate overlay sends your project details to Apex. Bring plans, specifications, and photos to the project conversation or site review.

Common questions

Does this page certify that a ramp meets the ADA Standards?

No. A marketing page cannot certify a ramp or an accessible route. The project's drawings, accessibility details, specifications, required review, and constructed conditions determine compliance. Apex scopes concrete work against those project documents.

What belongs in an ADA curb-ramp bid package?

Include the ramp and site-plan drawings, elevations, applicable specifications, detectable-warning details, and the bid date. Add pedestrian-route, access, drainage, occupancy, and phasing information. The documents should define acceptance as well as the concrete itself.

Can a photo replace the required ramp details?

No. Photos are useful for showing existing approaches, curb conditions, and site constraints. They do not replace design elevations, landing geometry, warning-surface requirements, or other details required by the project documents.

Related planning guides

Discuss ada curb ramps with Apex

Plan your concrete project

971-514-5420
How should Apex reply? Phone or Email is required.

Prefer a conversation? or call 971-514-5420.