Why base preparation belongs in the written concrete scope
What to ask about excavation, base material, compaction, drainage, reinforcement, and joints before a concrete pour.
Read the guideNorthwest Portland concrete planning guide
Coordinate footings, stem walls, and foundation-related concrete against your plans and any required engineering. A sloped site may require particular attention to elevations, retaining conditions, and water movement. Include the approved drawings and photos that show how the site changes across the footprint.

Stem walls, footings, and foundation-related slabs need a documented starting point. Plans, elevations, reinforcement notes, required engineering, and the existing structure define the work. Apex can coordinate the concrete scope against those documents without presenting a marketing page as structural design.

Formwork, base preparation, reinforcement, elevations, and placement access all need review before the pour. Water movement and connections to an existing structure can change the work even when the footprint looks simple. Photographs support the plan review; they do not replace it.
There is no responsible per-square-foot price without the actual scope. These are the inputs that change the work and belong in a written estimate.
Slabs, stem walls, and footings as drawn.
References organize the scope. The actual drawings and specifications determine what is included.
For a sloped footprint, include photos from above and below the work area. Show step-downs, retaining features, and where water collects or leaves the site. These observations support the plan review; they do not prescribe a foundation or drainage design.
Provide the approved elevations and any geotechnical or structural documents that apply. A stepped foundation or retaining condition may involve requirements that are not visible in a single wide photograph.
Scope check: approved elevations, retaining conditions, drainage, and required professional documents govern the concrete work.
A sloped site may require particular attention to elevations, retaining conditions, and water movement. Include the approved drawings and photos that show how the site changes across the footprint.
Send plans, photos, and the project location
Review site conditions, access, drainage, and required documents
Coordinate the concrete scope against approved plans
Include your ZIP code, approximate size, timing, and any access or occupancy constraints. Commercial requests should include plans, specifications, and the bid date.
The estimate overlay sends your project details to Apex. Bring plans, specifications, and photos to the project conversation or site review.
No. A photograph cannot establish structural requirements, soil capacity, reinforcement, or required elevations. Foundation-related concrete is coordinated against approved plans and any required engineering. The site review identifies what documents and professional input are still needed.
Send the plans, the project location, photos of the footprint and equipment access, and any engineering or permit documents. Include grade changes, neighboring structures, and the relationship to an existing foundation. Those details make the concrete scope more useful.
No. Related trades and site work should never be assumed. The written scope needs to identify excavation, base preparation, drainage, waterproofing, backfill, and any exclusions or work assigned to others. The approved plans govern the technical requirements.
Foundation or addition plans. Photos of the footprint and equipment access. Drainage, grade, and neighboring-structure details. Any engineering or permit documents. Elevations and step-downs. Retaining and drainage conditions. Required engineering documents.
What to ask about excavation, base material, compaction, drainage, reinforcement, and joints before a concrete pour.
Read the guideHow to review slope, drainage, surface use, finish texture, and curing conditions for a wet Portland-area site.
Read the guideThe photos that help a concrete contractor understand the surface, edges, access, drainage, and finish choices before a site visit.
Read the guide