Why base preparation belongs in the written concrete scope
What to ask about excavation, base material, compaction, drainage, reinforcement, and joints before a concrete pour.
Read the guideSouthwest Portland concrete planning guide
Coordinate footings, stem walls, and foundation-related concrete against your plans and any required engineering. Terraces and hillside approaches can affect the foundation sequence and equipment route. Show each elevation change, access point, and any retaining features that relate to the concrete scope.

Stem walls, footings, and foundation-related slabs need a documented starting point. Plans, elevations, reinforcement notes, required engineering, and the existing structure define the work. Apex can coordinate the concrete scope against those documents without presenting a marketing page as structural design.

Formwork, base preparation, reinforcement, elevations, and placement access all need review before the pour. Water movement and connections to an existing structure can change the work even when the footprint looks simple. Photographs support the plan review; they do not replace it.
There is no responsible per-square-foot price without the actual scope. These are the inputs that change the work and belong in a written estimate.
Slabs, stem walls, and footings as drawn.
References organize the scope. The actual drawings and specifications determine what is included.
Photograph each terrace and the route between levels. Note where forms, reinforcement, and equipment would be staged and how crews would reach the pour. A stepped site can require a different sequence from a level garage or addition footprint.
Include any retaining walls, downhill neighbors, and drainage paths in the project record. Their relationship to the foundation should be shown in the plans or reviewed by the appropriate professional rather than inferred from appearance.
Scope check: stepped elevations, safe staging, retaining features, and drainage responsibilities need documented boundaries.
Terraces and hillside approaches can affect the foundation sequence and equipment route. Show each elevation change, access point, and any retaining features that relate to the concrete scope.
Send plans, photos, and the project location
Review site conditions, access, drainage, and required documents
Coordinate the concrete scope against approved plans
Include your ZIP code, approximate size, timing, and any access or occupancy constraints. Commercial requests should include plans, specifications, and the bid date.
The estimate overlay sends your project details to Apex. Bring plans, specifications, and photos to the project conversation or site review.
No. A photograph cannot establish structural requirements, soil capacity, reinforcement, or required elevations. Foundation-related concrete is coordinated against approved plans and any required engineering. The site review identifies what documents and professional input are still needed.
Send the plans, the project location, photos of the footprint and equipment access, and any engineering or permit documents. Include grade changes, neighboring structures, and the relationship to an existing foundation. Those details make the concrete scope more useful.
No. Related trades and site work should never be assumed. The written scope needs to identify excavation, base preparation, drainage, waterproofing, backfill, and any exclusions or work assigned to others. The approved plans govern the technical requirements.
Foundation or addition plans. Photos of the footprint and equipment access. Drainage, grade, and neighboring-structure details. Any engineering or permit documents. Stepped elevations. Equipment route and staging. Retaining features and drainage.
What to ask about excavation, base material, compaction, drainage, reinforcement, and joints before a concrete pour.
Read the guideHow to review slope, drainage, surface use, finish texture, and curing conditions for a wet Portland-area site.
Read the guideThe photos that help a concrete contractor understand the surface, edges, access, drainage, and finish choices before a site visit.
Read the guide